- Contact Person : Ms. Yan Cissy
- Company Name : Tianjin Haoyou Industry Trade Co., Ltd.
- Tel : 86-22-84905847
- Fax : 86-22-84905351
- Address : Tianjin,Tianjin,No.8 Huanhe West Road, Airport Industrial Park, Tianjin, China
- Country/Region : China
- Zip : 300308
ERW steel pipe
Tianjin Haoyou Industry
Presentation
Tianjin Haoyou Industry, founded in 2003, is a subsidiary company of Tianjin Materials and Equipments Group Corporation (Tewoo Group, former Bureau of Materials, a large-scale state-owned material circulating enterprise registered with a capital of RMB 2.5 billion and ranked 57th among the top 500 enterprises of China in 2010.)
Service:
Export –
Steel Product: We are the manufacture , mainly produce steel sheet and steel pipe . We are also the first-class agent of Baosteel, Capital steel (shougang), An steel , Ben steel, WISCO, HBIS, Ma steel , Ji steel , TPCO ,etc.
Our factory mainly produces and exports GI pipes used as structural scaffolding pipes and for water, gas, sewerage conveyance
ERW Steel Pipe | |||
O.D | O.D tolerance | W.T | Thickness Tolerance |
20--219MM | ±0.03 | 0.6--15MM | ±0.02 |
Length | 2--12M , according to customers' requirements | ||
Zinc coating | 80--600g/m2 | ||
International Standard | ISO 9001;2008 | ||
Standard | ASTM A53 / BS 1387-1985/API/JIS/DIN/EN/BS/GB | ||
Material | Q195/Q215/Q235/Q345/SPHC/08AL/08F/HG5/DF08/Q195-Q345/M8 | ||
Product Category : | Metallurgy, Mineral & Energy | ||
Technique: | High-frequency welded | ||
Packing | Package: 1. in bundles 2.waterproof package 3.loose package 4. Seaworthy package at the end of pipes 4.according to customers' requirements | ||
Usage | 1.structural scaffolding pipes. 2.For low pressure liquid delivery such as water , gas and oil. 3.For construction , e.g building greenhouse | ||
Main market: | Middle east, Africa, North and South America, East and West Europe, South and southeast Asia Australia | ||
Place of Origin | China | ||
HS code: | 7306309000 | ||
Productivity | 20000 Ton/Month | ||
Processing technology available: | Threading , coupling and with plastic caps protected | ||
Remarks | 1) Payment term : T/T or L/C at sight 2) Trade Terms : FOB / CFR /CIF 3) Minimum quantity of order : 25 MT 4) Delivery period : 10 to 30 Days . |
ERW steel pipe